Brinkman Project

Blue Agave Grill

Fort Collins, Colorado

Historic Building Restaurant Renovation

Client:

Blue Agave Grill

Design Team:

VFLA

Construction Start:

November 2013

Construction Finish:

March 2013

Total SF:

5,600

 

[ + ] More Info

Project Details

This restaurant space is located on the garden level of the historic Museum Building. The 100-year-old building formerly housed the Fort Collins Post Office.
The 5,600 SF restaurant required a complete renovation of the existing space including asbestos abatement and ceiling demolition. The new welcoming interior includes custom woodwork, warm color tones, and distressed metal accents. Windows were expanded on the north and east faces to create natural lighting throughout the space. Diners enjoy two dining areas as well as a full-service bar within the north dining room.
Construction completely transformed the dated office space into a vibrant restaurant that provides a distinct dining experience within one of Fort Collins’ oldest buildings.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Rodelle (Phase 2)

Fort Collins, Colorado

Warehouse, Office, and H3 Space

Client:

Rodelle

Design Team:

Ware Malcomb

Construction Start:

October 2013

Construction Finish:

July 2014

Total SF:

35,000 SF

 

[ + ] More Info

Project Details

This marked the second project that Brinkman built for Rodelle. Four years after the completion of their headquarters, Brinkman was selected to construct an additional building that connects to
the first to support their growing operations. With stringent client scheduling deadlines in place, the project was completed on time and on budget.

The building includes 35,000 SF of warehouse, office, and H3 space. Like the first project, considerations to accommodate dust control, scent migration, and flammable and explosive materials were incorporated throughout the facility.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Breeze Thru Car Wash

Greeley, Colorado

Ground-Up Car Wash

Client:

Breeze Thru Car Wash

Design Team:

Hauser Architects

Construction Start:

June 2014

Construction Finish:

November 2014

Total SF:

5,605

 

[ + ] More Info

Project Details

This car wash, located on 28th street in Greeley, features both a high-speed tunnel wash and a full-service interior and exterior service. The project is the fourth Breeze Thru in Northern Colorado and Wyoming. The tunnel uses a state-of-the-art conveyor system that allows for multiple cars to be washed simultaneously. The location includse complementary vacuums for all customers and customers are able to go through the wash in 10 minutes or less regardless of the services chosen.

Brinkman Project Brinkman Project
   
   
   

[ X ] Close

top
Brinkman Project

Rodelle (Phase 1)

Fort Collins, Colorado

Warehouse, Office, and Manufacturing Facility

Client:

Rodelle

Design Team:

Aller Lingle Massey

Construction Start:

June 2008

Construction Finish:

February 2009

Total SF:

32,717

 

[ + ] More Info

Project Details

This marked the first of two projects that Brinkman built for Rodelle. This phase included a ground-up, 32,717 SF owner occupied office, warehouse, and manufacturing building. This locally owned and operated business specializes in manufacturing and blending various seasonings and extracts. This location serves as the company's headquarters and houses their administrative, manufacturing, packaging, and shipping functions for the business.

The building was specifically designed and built to meet the unique needs of this client and includes considerations to accommodate dust control, scent migration, and flammable and explosive materials. Various structural and architectural elements and materials were used to mask the industrial nature of the facility.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

1933 Brewing

Fort Collins, Colorado

Brewery Renovation

Client:

1933 Brewing

Design Team:

Greg D. Fisher Architecture

Construction Start:

October 2013

Construction Finish:

March 2014

Total SF:

4,300

 

[ + ] More Info

Project Details

The 4,300 SF brewery project included the renovation of an existing space. The 3,100 SF first floor was completely remodeled to welcome customers and support brewery operations. The second floor loft space is utilized for storage.
The remodel created a bar area and tasting room that can hold up to 99 customers. The custom bar top was built using wood from 1930’s Coors Brewing Company cooler railroad cars. Patrons enjoy a relaxing environment that includes 55 inch televisions, electric outlets for laptops and phones and a window displaying brewing operations. The bar includes high-top, low-top, and long pub-style tables. There is a private room that can be utilized as a boardroom or meeting area.
A brewhouse area was also created to support the manufacturing and distribution of 1933’s flagship and speciality English and German Style Ales.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Hampton Inn & Suites

Boulder, Colorado

LEED Certified Hotel

Client:

Boulder, Hospitality, LLC

Design Team:

Pahl Architecture

Construction Start:

February 2012

Construction Finish:

June 2013

Total SF:

69,100 SF

 

 

 

 

 

[ + ] More Info

Project Details

This brand new Hampton Inn & Suites is located off the Diagonal Highway/Colorado State Highway 119 and in the midst of numerous businesses. The 69,100 SF, three-story hotel features a conference room, board room, pool and hot tub area, workout facility, and breakfast area. Of the 100 total rooms, 30 are suites offering additional square footage and greater layout functionality. Sustainable features are emphasized throughout the hotel such as solar panels, tankless water heaters, triple-paned windows and ceiling fans in each room. It is on track to achieve LEED Gold certification.

The Hampton Inn & Suites marks the first new hotel built in Boulder in the last eight years and the first new building in the Gunbarrel Gateway Center development.

Photos by Brian Weiss/Pahl Architecture.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Private Air Hangar

Loveland, Colorado

World-Class Private Hangar and Office Facility

Client:

Confidential

Design Team:

VFLA

Construction Start:

April 2012

Construction Finish:

January 2013

Total SF:

55,000

 

 

 

 

 

[ + ] More Info

Project Details

This state-of-the-art project is a private 55,000 SF hangar and office facility located at the Fort Collins-Loveland Municipal Airport. It consists of a pre-engineered steel building with clear spans of 150’ connected to a conventional three-story office building. The finished product will have allocated spaces for aircrafts, food storage, food prep, as well as class A commercial offices and conference rooms. The overall look of the facility is innovative and this unique space will revolutionize the form of hangars nationally.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Windsong Estate

Severance, Colorado

Special Events Center

Client:

Fairway Acres Inc.

Design Team:

VFLA

Construction Start:

April 2013

Construction Finish:

October 2013

Total SF:

9,600

 

[ + ] More Info

Project Details

This premier indoor-outdoor special events venue provides a new option for Northern Colorado wedding ceremonies/receptions, corporate events, and special events.

The 9,600 SF building sitting atop the highest point in Weld County. With western-facing windows, the space has natural lighting and expansive views of the Rocky Mountains and Front Range. Windsong offers indoor event spaces with private bars, a warming kitchen, a bridal suite, groom’s dressing room and a meeting area. A dramatic staircase connects the upper and main level of the interior.  There is an outdoor area with elaborate landscaping, scenic views and an over-sized patio for receptions and events.

 

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
   
   

[ X ] Close

top
Brinkman Project

St. Michael’s Town Square Buildings
4 and 5

Greeley, Colorado

Pedestrian-Oriented Retail Development

Client:

Town Square 3, LLC and Town Square 2, LLC

Design Team:

Thorp Associates, PC

Construction Start:

May 2007 (Building 4)

Construction Finish:

February 2008 (Building 4)

Construction Start:

June 2007 (Building 5)

Construction Finish:

December 2007 (Building 5)

Total SF:

30,000

 

[ + ] More Info

Project Details

Located in west Greeley, St. Michael’s Town Square is a pedestrian-oriented town center development designed to mimic the look and feel of an authentic town square.  The mixed-use buildings are positioned around a central amphitheater and park area.  Each unit within the development is designed with a unique facade incorporating various materials and paint schemes that create the appearance of individual buildings. 

Buildings 4 and 5 comprise the entire north side of the square and complete the final phase of St. Michael’s. Building 4 is a 2-story retail/office building with over 10,000 SF of build-to-suit top floor office space and approximately 11,000 SF of ground floor retail. Building 5 consists of over 9,000 SF of ground floor retail space that can accommodate up to seven individual units.

“Brinkman Construction is OUTSTANDING to work with. They are extremely professional and efficient and kept our project ahead of schedule and under budget. Their quality of service and commitment to excellence have far surpassed our expectations.”

Linda Naticchioni

Director of Operations, Calvin Enterprises

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Islamic Center of Fort Collins

Fort Collins, Colorado

Two-Story Islamic Center

Client:

ICFC

Design Team:

Dana Lockwood

Construction Start:

March 2012

Construction Finish:

September 2013

Total SF:

18,000

 

 

 

 

 

[ + ] More Info

Project Details

18,000 SF Islamic center located on a 3.26 acre site just southwest of the Colorado State University campus. The design of the two-story center blends Islamic and Northern Colorado architectural styles. It includes a prayer hall and mezzanine, library, conference room, lounge and multi-purpose room and an outdoor courtyard.  The center is topped by a 70-foot minaret and 52-foot dome both topped with crescent moons. The currently unfinished basement provides an option for further expansion for future needs.

Bringing this center to fruition has been in the works for nearly 18 years. In 1996, an ICFC committee was formed to initiate the process of building a new center. Between the raising of funds and finding the right site, it wasn’t until March of 2012 that construction began. With the completion of the new building, the Islamic Center will be able to better accommodate their congregation while providing increased opportunities for community outreach and education.

 

   
   
   
   
   

[ X ] Close

top
Brinkman Project

Baseline Crossing

Boulder, Colorado

Retail Development

Client:

East Baseline Investors, LLC

Design Team:

The Mulhern Group, Ltd.

Construction Start:

April 2012

Construction Finish:

November 2012

Total SF:

17,000

 

 

 

 

 

[ + ] More Info

Project Details

This is a brand new retail development in Boulder. Brinkman constructed two core/shell retail buildings totaling +/- 17,000 SF and conducted all necessary site work.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
   
   
   

[ X ] Close

top
Brinkman Project

Timberline Plaza

Fort Collins, Colorado

Ground-Up, Two-Story Building

Client:

Timberline Retail, LLC

Developer:

Everitt MacMillan

Design Team:

r4 Architects

Construction Start:

October 2007

Construction Finish:

May 2008

Total SF:

14,953

 

 

 

 

 

[ + ] More Info

Project Details

Professional Class “A” retail/office condominiums providing high visibility and offering an exceptional ownership opportunity. By design, the two story steel structure, wood framed commercial building offers numerous tenant lease/purchase square foot combinations.  This building has two floors with 7,714 SF on the first floor, and 7,238 SF on the second.

“The Brinkman team was exceptional in aligning the goals of the project to meet expectations of the project time line and budget. The team’s collaborative approach with the architect, engineers, and Everitt MacMillan, ensured that the completion of the project was a success.”

Stu MacMillan
Former President and CEO, Everitt MacMillan Development

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Peakview Retail

Loveland, Colorado

Contemporary Retail Center

Client:

Peakview Building One, LLC

Design Team:

The Architects’ Studio

Construction Start:

November 2008

Construction Finish:

April 2009

Total SF:

6,535

 

 

 

 

 

[ + ] More Info

Project Details

Peakview Retail Building Number 1 is a contemporary designed retail center consisting of approximately 6,535 SF.  This building was designed for three separate suites and additional buildings are currently in the planning phase.

Prior to construction of this building, Brinkman Partners performed a broad array of services for the land owner/client.  As listing broker for the retail center, the brokerage team was able to secure two prominent tenants despite a significant market downturn for the demand of retail space.  Brinkman Construction managed the preconstruction process, optimizing the building configuration to suit the initial tenants’ needs, while phasing the project in accordance with market conditions. The company also managed the permitting process while simultaneously preparing comprehensive loan packages submitted to potential financial lenders.

“Brinkman Construction’s know-how and ability specific to development and construction services, has been critical to the success of this project! I am extremely pleased with the end result as well as the incredible client service I received throughout this process.  The trust and relationship built from this experience is priceless and I will certainly look to them again in the future for their expertise.”

Kris Fleischli

Managing Partner, Peakview Building One, LLC

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Palomino Mexican Restaurant

Loveland, Colorado

Ground-Up Restaurant

Client:

Palomino Mexican Restaurant

Design Team:

r4 Architects

Construction Start:

December 2010

Construction Finish:

June 2011

Total SF:

6,080

 

 

 

 

 

[ + ] More Info

Project Details

This is a 6,080 SF ground-up, single-story, wood-framed restaurant.  The finished space can hold 250 occupants and includes a fully operational commercial kitchen with hood and grease interceptor, a wrap-around bar with five flat screen televisions, large dining room and outdoor, covered patio/seating area. There are high-level finishes throughout. Construction included a concrete paved parking lot and private drive. 

“The partnership as well as friendship that we formed by doing business with Brinkman Construction has proven to be gratifying. The people we dealt with were courteous and responsive to all of our needs.  We would love to do business with Brinkman Construction in the future and would highly recommend them on any project.”

Richard Lucio
Owner, Palomino Mexican Restaurant

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Celestino’s Pizza

Fort Collins, Colorado

Restaurant Build Out

Client:

Enzo Perri

Design Team:

Aller Lingle Massey Architects, P.C.

Construction Start:

August 2010

Construction Finish:

October 2010

Total SF:

2,075

 

 

 

 

 

[ + ] More Info

Project Details

This 2,075 SF tenant improvement project required the interior build out of this premier retail space located in the Flats at the Oval mixed-use project directly across from the Colorado State University campus. Construction included a full kitchen with pizza ovens, walk-in freezer, dining area, mounted flat screen televisions, exposed ceilings, and an office area.

   

[ X ] Close

top
Brinkman Project

Mugs Coffee Lounge

Fort Collins, Colorado

Coffee Lounge Build Out

Client:

McCabe Callahan

Design Team:

JCL Architecture, Inc.

Construction Start:

August 2010

Construction Finish:

October 2010

Total SF:

1,997

 

 

 

 

 

[ + ] More Info

Project Details

This 1,997 SF tenant improvement project required the interior build out of this premier retail space located in the Flats at the Oval mixed-use project directly across from the Colorado State University campus. Construction included kitchen space with numerous sinks, refrigerators/freezers, stainless steel prep tables, a convection oven, a food warmer, and display case with food warmer. Interior features modeled the unique Mug’s branding elements and included coffee bar seating areas, lounge areas, raised floors, and exposed air ducts.

   

[ X ] Close

top
Brinkman Project

Savory Spice Shop

Fort Collins, Colorado

Rustic Retail Space

Client:

Fort Collins Spice Merchants, LLC

Design Team:

Cortland Morgan

Construction Start:

July 2011

Construction Finish:

August 2011

Total SF:

1,830

 

 

 

 

 

[ + ] More Info

Project Details

This 1,830 SF interior renovation project transformed a vacant space into an antique-looking spice shop at 123 North College Avenue in Old Town. The rustic feel of the store was created by complimenting new wood floors, a tin ceiling and high-end lighting fixtures with original exposed brick. Located in the historic Opera Galleria, the original windows and front entry were maintained so as to not alter the storefront.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Spooners Frozen Yogurt

Fort Collins, Colorado

Restaurant Tenant Improvement

Client:

B n F, LLC

Design Team:

G3 Architecture

Construction Start:

February 2010

Construction Finish:

April 2010

Total SF:

1,578

 

 

 

 

 

[ + ] More Info

Project Details

This 1,578 SF tenant improvement project in Front Range Village represents one of the most popular spots in this pedestrian shopping center. The space was taken from its core and shell condition and finished to accommodate the vibrant look of Spooners Frozen Yogurt.  The work was done in just over two months and incorporated all of the distinct and innovative elements of the brand including a mosaic tile wall surrounding the yogurt dispensers, custom counters and display cases and built-in fireplace.