Brinkman Project

Hahn's Peak II

Loveland, Colorado

2-Story Spec Office Building

Client:

McWhinney Enterprises

Design Team:

Ware Malcomb

Construction Start:

June 2015

Construction Finish:

April 2016

Total SF:

55,000

 

[ + ] More Info

Project Details

This ground-up construction project marks the second phase of the Hahn's Peak office buildings located in Centerra in Loveland. The spec office building offers Class A office space while maintaining a conisistent look with the first building. The core-and-shell project is currently being marketed to prospective tenants.

Brinkman Project Brinkman Project
   

[ X ] Close

top
Brinkman Project

Galvanize

Fort Collins, Colorado

Collaborative Office Space

Client:

242 Linden LLC

Design Team:

The Architects' Studio

Construction Start:

February 2015

Construction Finish:

July 2015

Total SF:

14,392

 

[ + ] More Info

Project Details

This renovation of a 114-year-old building converted a former event center into a vibrant co-working office space. The renovation required full removal of the existing storefront and the pouring of new concrete floors. The building features an open office design with exposed metal structure and reclaimed wood throughout. The office will offer entrepreneurs a choice of open desks and offices as well as a classroom and meeting spaces.

Work also included kitchens and lounge areas with an outdoor patio, featuring beer and coffee.

Brinkman Project Brinkman Project
   

[ X ] Close

top
Brinkman Project

Fuse on Harmony

Fort Collins, Colorado

Innovative Class A Office Building

Client:

Multi Tenant

Developer:

Brinkman Partners

Design Team:

Open Studio Architecture

Construction Start:

January 2014

Construction Finish:

December 2014

Total SF:

30,600

 

[ + ] More Info

Project Details

30,600 SF, two-story Class A office building in Harmony Technology Park. Brinkman Partners occupies the entire 15,000 SF first floor and the second floor by US-Reports.

The look and feel of the building incorporates the innovation emphasized throughout Brinkman’s corporate culture. An outdoor patio with a roll-up garage door creates an indoor/outdoor space utilized for company and client gatherings. As a whole, the building features an open-air look with expansive exterior windows and natural lighting throughout. The design focuses on sustainable elements and green building.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Drive II

Denver, Colorado

Project

Developer:

Zeppelin Development, Inc.

Design Team:

Stephen Dynia Architects

Total SF:

51,000

 

[ + ] More Info

Project Details

This 51,000 SF, four-story office building marks the second Drive building in Denver River North’s Taxi development. The innovative office space was built around the requirements of 20-30 new economy—high tech and creative businesses. Construction included unique elements seen throughout the original Drive building, also constructed by Brinkman Construction, including garage-style glass doors in all the spaces that add natural light and can be opened for fresh air and informal common spaces including a gourmet snack bar. This award-winning concept centers on the need in the market for cutting-edge workspace that is also informal, collaborative, and fun.

   

[ X ] Close

top
Brinkman Project

First Bank Renovation

Fort Collins, Colorado

Downtown Bank Renovation

Client:

FirstBank

Design Team:

VFLA

Construction Start:

February 2014

Construction Finish:

August 2014

Total SF:

5,935

 

[ + ] More Info

Project Details

The 5,935 SF space underwent a full interior demolition and remodel. The renovation included such highlights as a skylight running from east to west at the building’s entrance, a large meeting room in the basement for internal and community use, an added entry door on the eastside of the building, and high-end finishes throughout.

Located on a highly trafficked corner in downtown Fort Collins, the renovation was strategically staged to cause as little disruptions as possible to pedestrian traffic passing by.

The location serves as FirstBank’s fourth branch in Fort Collins. It will provide a convenient location for clients in Old Town and on the north side of the city.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Canyon Place

Fort Collins, Colorado

Downtown Office Building & Restaurant

Client:

Blue Ocean Enterprises

Design Team:

The Architects' Studio

Construction Start:

January 2014

Construction Finish:

March 2014

Total SF:

54,000 sq. ft.

 

[ + ] More Info

Project Details

This state-of-the-art, Class A office building consists of an all steel and concrete structure. It includes five levels throughout 54,000 SF. The core/shell building was designed by Architects Studios. The interiors were designed by Blue Ocean Design to create an innovative and productive atmosphere for staff and visitors. The building includes luxury executive offices and boardrooms, real wood cabinetry, specialized lighting throughout, high-end coffee bar, and an exterior patio with a built-in BBQ. The first floor features space for a full-service restaurant.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

5042 Technology Park

Fort Collins, Colorado

Office/Flex Building

Client:

MAVDevelpment

Design Team:

Aller Lingle Massey Architects

Construction Start:

August 2013

Construction Finish:

April 2014

Total SF:

50,000 sq. ft.

 

[ + ] More Info

Project Details

5042 Technology Parkway marks the first spec office building constructed in Fort Collins’ progressive Harmony Technology Park. The 50,000 SF building is a catalyst for future growth in the 105-acre development by Ann Arbor-based MAVDevelopment. MAVD’s vision for the innovative business park will continue to be brought to life as they move forward with additional buildings. Work on the core/shell of the building included a modern design that is setting the standard for future buildings in the park.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Kierland Corporate Center Phase II

Scottsdale, Arizona

Class A Office Campus and Parking Structure

Client:

Calvin Enterprises, Bataa Kierland, LLC

Design Team:

Davis Architecture

Construction Start:

November 2007

Construction Finish:

June 2009

Total SF:

196,600

 

 

 

 

 

[ + ] More Info

Project Details

This three-story, state-of-the-art office building is the second phase of the Kierland Corporate Center project in Scottsdale, Arizona. The campus includes 81,600 SF of class A office and mixed-use/retail space. The exterior facade is true to modern southwest architecture and consists of masonry, stone, high efficiency glazing and stucco.  The project also consists of a new, 115,000 SF, 339-space parking structure with above grade covered and uncovered parking for the entire Kierland Corporate Center campus.

“Brinkman Construction is OUTSTANDING to work with. They are extremely professional and efficient and have managed to keep our project ahead of schedule and under budget. Their quality of service and commitment to excellence have far surpassed our expectations.”

Linda Naticchioni
Director of Operations, Calvin Enterprises

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Harmony One

Fort Collins, Colorado

Class A Office Core and Shell Project

Client:

Multi Tenant

Developer:

Everitt MacMillan

Design Team:

VFLA

Construction Start:

May 2007

Construction Finish:

June 2009

Total SF:

55,000

Other:

LEED Certified

 

 

 

[ + ] More Info

Project Details

A five-story class A office building along the Harmony Corridor providing 55,000 SF of one-of-a-kind tenant space for this region. The design and materials exude a timeless look that will continue to stand out as a premier building for years to come. Some of the 'green' elements in the building are waterless urinals and low flow fixtures, energy efficient lighting and mechanical systems, FSC wood products, water efficient landscaping, and plenty of daylight and views.

As a partner in the development, the general contractor, and owner in the building, Brinkman Partners recognized the importance of incorporating the environmental elements into the building.

The other building occupants include, Everitt Companies, First Western Trust Bank, Security Title, Westward Development, Eads & Associates, and Heit Inc.

“Brinkman delivered an outstanding core shell building at Harmony One. Their team was very reliable and delivered exactly what I had envisioned, a quality Class A office building along the Harmony corridor.”

Stu MacMillan
Former President and CEO, Everitt MacMillan Development

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

OtterBox Corporate Headquarters

Fort Collins, Colorado

World Corporate Headquarters Renovation

Client:

Otter Properties, LLLP

Design Team:

The Architects' Studio
Oglesby Design

Construction Start:

May 2010

Construction Finish:

June 2011

Total SF:

52,000

Other:

LEED Certified
Fort Collins Urban Design Award (2011)

 

 

 

[ + ] More Info

Project Details

52,000 SF, state-of-the-art building renovation, addition, and tenant improvement project for Otterbox’s Class A Corporate Headquarters. This high-tech project is designed to create an exciting and productive atmosphere for the staff and for visitors. It includes luxury offices and executive boardrooms, coffee bars on each floor, an interior slide, bike maintenance room, massage room, a saltwater fish tank, built-in TV’s and monitors throughout, interior brick walls, engineered wood walls, real wood cabinetry, special lighting throughout, one interior and one exterior fireplace, open spaces, and an outdoor BBQ/patio area on the third floor. Other unique design features include an interior sloped storefront system and interior office garage doors.

Learn More About This Project

 

“We feel what you have created everyday and you need to know that it really does make a difference in so many people’s lives.”

Nancy Richardson
President, OtterCares

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Taxi

Denver, Colorado

Urban Office Building

Client:

Zeppelin Development Inc.

Design Team:

Stephen Dynia Architects

Construction Start:

February 2012

Construction Finish:

October 2012

Total SF:

38,000

 

[ + ] More Info

Project Details

This four-story, 40,000 SF building is part of the Denver River North Taxi campus. It is made up of cutting edge office space and amenities including a salon and coffee shop. The design draws on the industrial feel of the location which is a former Yellow Cab headquarters.

The office spaces, ranging from 500 to 26,000 SF, tie in many of the most successful features of the five previous TAXI buildings. These elements include 52 garage-style glass doors that are integrated even on upper floors to provide views, light and open air workspace. Recycled gymnasium flooring provides countertops throughout the tenant spaces and common areas.  Skylights and glass floors that span from the roof down to the second floor create a well-lit and natural feeling throughout Drive.   

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
   
   

[ X ] Close

top
Brinkman Project

Custom Blending Corporate Headquarters

Fort Collins, Colorado

Specialized Office, Warehouse, Manufacturing Building

Client:

CBI Real Estate Holdings, LLC

Design Team:

Aller Lingle Massey Architects, P.C.

Construction Start:

June 2008

Construction Finish:

February 2009

Total SF:

32,717

Role: 

GC

 

[ + ] More Info

Project Details

The Custom Blending facility is approximately 32,716 SF of owner occupied office, warehouse, and manufacturing areas. The client is a locally owned and operated business specializing in the manufacturing and blending of various seasonings and extracts. This location will serve as the company's headquarters and will house the administrative, manufacturing, packaging, and shipping functions of the business.

The building was specifically designed and built to meet the unique needs of this client and includes considerations to accommodate dust control, scent migration, and flammable and explosive materials. Various structural and architectural elements and materials were used to mask the industrial nature of the facility.

“Brinkman Construction is made up of doers, not talkers. Their people communicate well and our new facility was completed ahead of schedule and within budget. Building a new facility can be stressful at best; Brinkman Construction made it a positive experience.”

John Conway
Owner, Custom Blending

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Professional Offices at Oakridge

Fort Collins, Colorado

Three-Building Office Campus

Client:

Oakridge Office, LLC and Everitt Companies

Design Team:

Aller Lingle Massey Architects, P.C.

Construction Start:

July 2005

Construction Finish:

December 2005

Total SF:

20,000

 

 

 

 

 

[ + ] More Info

Project Details

The professional Offices at Oakridge are the result of a unique partnership between Brinkman Partners and Everitt Companies.  This business park offers not only a prime location to both tenants and clients alike, but a sense of timeless quality.  The three-building campus includes over 20,000 SF and was designed and built to optimize the use of a vacant 1.3 acre lot.  The buildings contain features reflective of the Rocky Mountain environment with a mix of cedar, stone, and brick veneer.  With the best in design-build construction and the beauty of mature landscaping, the buildings will continue to provide a high-quality product for many years to come.

The buildings’ occupants include EKS&H, The Community Foundation of Northern Colorado, Pinnacle III, and AXA Equitable-Phillips Financial.

“Brinkman Construction completed our building right on schedule and within the budgeted amount.  Brinkman staff members have gone out of their way to make sure that we are pleased with the quality of the workmanship.  There has been excellent attention to every detail."

Ray Caraway
President, Community Foundation of Northern Colorado

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Gateway at Centerra Condominiums, Building D

Loveland, Colorado

Core and Shell Professional Office Condominium

Client:

McWhinney Enterprises

Design Team:

Aller Lingle Massey Architects, P.C.

Construction Start:

November 2006

Construction Finish:

July 2007

Total SF:

15,652

 

 

 

 

 

[ + ] More Info

Project Details

The Gateway Building "D" core and shell project is a professional office condominium concept in the heart of Centerra, the largest mixed-use development in Northern Colorado and adjacent to the Medical Center of the Rockies. Building "D" is the largest building of a four-building development of matching design and similar size.

The wood framed, steel structure, two-story building has common area restrooms on both floors, common stairs, common elevator, and common heating & cooling. Brinkman excelled in completing this highly-visible, multi-owner premier project incorporating a unique, integrated real estate approach by assembling the buyers group for the entire building and providing complete construction services, including design coordination for the tenant finish portion of the project for Front Range Business Centers, who are involved as part-owner of the space.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Timberline Plaza

Fort Collins, Colorado

Ground-Up, Two-Story Building

Client:

Timberline Retail, LLC

Developer:

Everitt MacMillan

Design Team:

r4 Architects

Construction Start:

October 2007

Construction Finish:

May 2008

Total SF:

14,953

 

 

 

 

 

[ + ] More Info

Project Details

Professional Class “A” retail/office condominiums providing high visibility and offering an exceptional ownership opportunity. By design, the two story steel structure, wood framed commercial building offers numerous tenant lease/purchase square foot combinations.  This building has two floors with 7,714 SF on the first floor, and 7,238 SF on the second.

“The Brinkman team was exceptional in aligning the goals of the project to meet expectations of the project time line and budget. The team’s collaborative approach with the architect, engineers, and Everitt MacMillan, ensured that the completion of the project was a success.”

Stu MacMillan
Former President and CEO, Everitt MacMillan Development

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Agrium Advanced Technologies

Loveland, Colorado

Corporate Headquarters Tenant Finish

Client:

Agrium Advanced Technologies

Design Team:

Box Studios

Construction Start:

June 2009

Construction Finish:

November 2009

Total SF:

31,666

 

 

 

 

 

[ + ] More Info

Project Details

The 31,666 SF space houses Agrium’s corporate offices, located on the 3rd and 4th floors of Rangeview III at Centerra in Loveland.  With high-end interior finishes throughout, the office layout includes boardroom meeting spaces, managers and staff offices, and a break room area with spectacular views of the Front Range. Unique architectural detail throughout includes etched glass custom floor-to-ceiling walls, decorative millwork and casework, and additional custom specialty walls. The Brinkman team managed an aggressive eight-week schedule for a 4th floor only completion date of August 10, 2009.

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

ITT Technical Institute

Westminster, Colorado

Interior and Exterior Building Renovation & Tenant Improvement

Client:

Woodbury Corporation

Design Team:

PBV Architects

Construction Start:

March 2011

Construction Finish:

July 2011

Total SF:

26,914

 

 

 

 

 

[ + ] More Info

Project Details

This project consisted of extensive interior improvements and exterior refacing on this 26,914 SF, three-story building for ITT Technical Institute.  The interior space was completely dismantled and rebuilt to include new mechanical and electrical systems, all new floor and bathroom finishes, and the addition of an administration office and classrooms. Exterior renovations consisted of new windows and the removal of sloped exterior glazing and siding elements.  These were replaced with new vertical wall framing with stucco and brick finish.  The building has been restructured from a pyramid form to a box-shaped building.  The work transformed the building to create a more modern appearance.

To improve sustainability, as many gutted materials as possible from the original space were salvaged/recycled.

“From pro-forma to punch list, the Brinkman team took the job in stride, creative, collaborative and competent. On a job with so many potential land mines, change orders were kept to a minimum and I always felt they were working with the owners’ interests in mind.”

O. Randall Woodbury
President, Woodburry Corporation

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

OtterBox @ 318 Canyon

Fort Collins, Colorado

Interior and Exterior Building Renovation

Client:

JJ Enterprises 318 LLLP

Design Team:

VFLA
Oglesby Design

Construction Start:

September 2010

Construction Finish:

May 2011

Total SF:

17,100

 

 

 

 

 

[ + ] More Info

Project Details

This three-phase project consisted of an interior and exterior renovation of one of Otterbox’s secondary office spaces. The overall design mirrors that of the Otterbox Corporate Headquarters building (also a project of Brinkman Construction). The interior of the space was completely gutted and refinished to Class A office space with a more high-tech look that includes coffee bars on each of the three floors. Sunshades and canopies have been added to the exterior of the building to improve its overall energy usage. The building’s exterior has been completely re-landscaped with new concrete, boulders, landscape furniture, a storage unit for employee bikes, an exterior patio with a trellis, benches, and tables.

To improve sustainability, as many gutted materials as possible from the original space were salvaged and donated locally.

“The Brinkman Construction team is excellent at being a part of the creative process rather than 'cookie cutters' who are apprehensive about thinking ‘outside the box’. They are always motivated to work with me and the client to make each detail the best it can be.”

Dawn Oglesby
Owner, Oglesby Design

Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project
Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

CSURF @ 2545 Research Boulevard

Fort Collins, Colorado

Building Renovation and Addition

Client:

CSURF

Design Team:

RB+B Architects

Construction Start:

May 2012

Construction Finish:

March 2013

Total SF:

15,300

 

[ + ] More Info

Project Details

The first phase of this project entailed the remodel of the 11,000 SF existing building purchased by the Colorado State University Research Foundation (CSURF). To accommodate the time restraints of the upcoming school year, the construction was completed over a period of just eight weeks. The 4,300 SF addition to the facility created new offices and training rooms. The building houses Colorado State University OnlinePlus, a division through CSU that delivers 34 online and distance programs, services, and experiences to over 10,000 students worldwide, in support of the University’s outreach and access mission.

Brinkman Project Brinkman Project
   
   

[ X ] Close