| Client: |
EAN (Enterprise Rent-A-Car) |
| Developer: |
|
| Contractor: |
Brinkman Construction, LLC |
| Architect: |
Vaught Frye Ripley Design |
| Square Footage: |
25,000 SF |
| Construction Start/Finish: |
January - April 2009 |
A 25,000 SF tenant finish that required demolition, quick turn-around, and protection of finished tenant space (previously a private school). Although the client for this project did not require the team to divert the demolition materials from the landfill, Brinkman felt it was important to follow their company Sustainability Program. The project team was able to successfully divert the majority of the existing materials from the landfill including: steel, ceiling tile, carpet, plumbing fixtures, insulation and cabinetry. These products were either recycled or reused by other building owners in the northern Colorado community. |
|